June 17 Work Party Recap

Our June 17th work party was met with great attendance and great weather. We installed the bulletin board at the clay slide (3/4 mile in from Barlow Pass) then caravanned to the townsite on the new access road. There we did brushing of Dumas St and the turntable, secured the Forest Service Cabins, and did some ground cleanup and surveying at the MCPA lots on Dumas Street.

Some members worked from BLM maps to locate the corners of the former Trump (Drumpf) property; this is visible just over the Sunday Creek foot bridge; turn right just after crossing the creek, before you reach the powerhouse.

David Cameron educated members and visitors with his knowledge and period photographs. A high school student from Bellevue did some filming for a journalism project.

Lunch Break June 2017